The Gandaria assembly team is completing the expansion of the grain storage facility Lumina, located in Constanta County, Romania.

The facility comprises 5 silos of 1.500 tons and a grain cleaning and drying system equipped with buffer silos. The installation has a loading and unloading capacity of 100 t/h.

Gandaria assembly team is preparing the technical details for the construction of the project, including:

  • A new 5.35/10 silo for the dryer, with a capacity of 288 m3.
  • A new chain conveyor for linking grain distribution directly to the drying process.
  • A new truck loading silo with a capacity of 100 m3.

The installation is equipped with a SCADA system to manage the flow from the computer, also supplied by Silos Cordoba.

Need more information?

Request a no obligation quote

Subscribe To Our Newsletter

Join our mailing list to receive the latest news and updates from our group. / Regístrate a nuestra newsletter para recibir novedades de nuestro grupo.

You have Successfully Subscribed!

Share This