The expansion of the “Alsur” quinoa storage plant in Antequera in Antequera is ready.
The quinoa processing plant began operating in the summer of 2016, coinciding with the first harvest of this pseudocereal in the province. With an investment of over 3.5 million euros, it is one of the most modern quinoa processing plants in Europe.
The expansion includes the construction of four new silos with a storage capacity of 1,000 tons of quinoa each: 10.70 m diameter silos, about 25 m high that will connect with the lines already installed in 2016 by chain conveyors. Unloading will be done by pneumatic transport to the factory where the quinoa is processed.