The new storage plant for maize and soybeans opened in Tunisia has a capacity of 60,000 tons.

The new storage facility of Nutrimix and Green Label Oil (GLO) has already been completed. Both companies belong to the Poulina group; the most important group of the sector in Tunisia.

The project consists of 10 silos model 22.92/14, whose capacity exceeds 6,000 tons, destined for the storage of corn and soybean grain.

Gandaria has designed the entire plant with its complex metal structures, its more than three meters wide walkways that support twice the load of 200 tons per hour and special towers that connect Nutrimix and GLO.

This is a turnkey project entirely assembled by Silos Córdoba.

Storage plant Tunisia

Benötigen Sie weitere Informationen?

Fordern Sie ein unverbindliches Angebot an

Subscribe To Our Newsletter

Join our mailing list to receive the latest news and updates from our group. / Regístrate a nuestra newsletter para recibir novedades de nuestro grupo.

You have Successfully Subscribed!

Share This