{"id":48890,"date":"2019-03-15T08:50:47","date_gmt":"2019-03-15T07:50:47","guid":{"rendered":"https:\/\/gandariaspain.com\/sin-categorizar\/silos-cordoba-has-signed-a-contract-for-the-construction-of-a-grain-terminal-in-nigeria\/"},"modified":"2019-12-27T11:03:40","modified_gmt":"2019-12-27T10:03:40","slug":"silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria","status":"publish","type":"post","link":"https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/","title":{"rendered":"Gandaria firma la construcci\u00f3n de una terminal granelera en Nigeria"},"content":{"rendered":"<p>[et_pb_section fb_built=\u00bb1&#8243; _builder_version=\u00bb3.22.3&#8243;][et_pb_row _builder_version=\u00bb3.25&#8243; background_size=\u00bbinitial\u00bb background_position=\u00bbtop_left\u00bb background_repeat=\u00bbrepeat\u00bb][et_pb_column type=\u00bb4_4&#8243; _builder_version=\u00bb3.25&#8243; custom_padding=\u00bb|||\u00bb custom_padding__hover=\u00bb|||\u00bb][et_pb_text _builder_version=\u00bb4.0.9&#8243; background_size=\u00bbinitial\u00bb background_position=\u00bbtop_left\u00bb background_repeat=\u00bbrepeat\u00bb]<\/p>\n<p><strong><em>La nueva terminal granelera estar\u00e1 situada en el Puerto de Tincan, Lagos, Nigeria y mover\u00e1 m\u00e1s de 850.000 toneladas de trigo y ma\u00edz al a\u00f1o. <\/em><\/strong><\/p>\n<p><strong>Josepdam Port Services Nigeria Ltd<\/strong> \u2013 empresa concesionaria del Puerto de Tincan en Nigeria \u2013 <strong>y Gandaria S.L.U<\/strong> acaban de firmar el contrato de construcci\u00f3n de una nueva planta de almacenamiento de granos, principalmente para trigo y ma\u00edz, que tendr\u00e1 una capacidad total de 145.000 toneladas.<\/p>\n<p>Una vez que se complete la instalaci\u00f3n, la empresa podr\u00e1 mover m\u00e1s de 850.000 toneladas al a\u00f1o.<\/p>\n<p>La planta de almacenamiento ha sido concebida para <strong>recibir 1.200 toneladas\/hora<\/strong> \u2013 con 2 descargadores de barcos de 600 toneladas\/hora trabajando en paralelo \u2013 y para <strong>entregar hasta 600 toneladas\/hora<\/strong> a los clientes del puerto y al mercado local.<\/p>\n<p>La instalaci\u00f3n completa contar\u00e1 con <strong>silos asentados <\/strong>de 10.272 y 6.152 toneladas y tendr\u00e1 una <strong>capacidad total de almacenamiento de 145.784 toneladas.<\/strong><\/p>\n<p>Tambi\u00e9n contar\u00e1 con un sistema de carga de camiones con 6 silos especialmente <strong>dise\u00f1ado para cargar unos 20 camiones de 30 toneladas por hora<\/strong>.<\/p>\n<p>La instalaci\u00f3n estar\u00e1 <strong>completamente automatizada<\/strong> e incluir\u00e1 <strong>sistema de ventilaci\u00f3n<\/strong>, \u00a0<strong>sistema de control de temperatura<\/strong> y <strong>la \u00faltima tecnolog\u00eda en gesti\u00f3n de almacenamiento de grano<\/strong>. La construcci\u00f3n de la terminal de silos met\u00e1licos ascender\u00e1 a unos <strong>80 millones de d\u00f3lares<\/strong> y se espera que est\u00e9 en funcionamiento en dos a\u00f1os.<\/p>\n<p>Nigeria importa grandes cantidades de grano para alimentar a su elevada poblaci\u00f3n. El trigo es importante para la dieta de muchos nigerianos, pero el pa\u00eds depende de las importaciones para producir la harina de trigo, la pasta y dem\u00e1s productos que los consumidores necesitan.<\/p>\n<p>El Consejo Internacional de Cereales (CIC) estima que la producci\u00f3n total de cereales de Nigeria en 2018-19 se sit\u00faa en torno a los 19,1 millones de toneladas, frente a los 18,9 millones del a\u00f1o anterior. La cifra incluye una cosecha de 11 millones de toneladas de ma\u00edz, que se mantiene, y una cosecha de 6,5 millones de sorgo, que aumenta frente a los 6,3 millones de toneladas del a\u00f1o anterior.<\/p>\n<p>Las importaciones totales de grano en Nigeria (que comprende trigo y cereales secundarios) rondar\u00e1n los 5,6 millones de toneladas en 2018-19, frente a los 5,5 millones del a\u00f1o anterior. Las principales importaciones del pa\u00eds son de trigo, que se prev\u00e9 que se mantengan en 5,2 millones de toneladas. Seg\u00fan estimaciones, Nigeria importar\u00e1 110.000 toneladas de trigo duro, lo que supondr\u00e1 un aumento frente a las 100,000 toneladas de 2017-18. Seg\u00fan el ICC, la cosecha de arroz de Nigeria se mantuvo en 3,8 millones de toneladas en 2018, mientras que las importaciones de arroz aumentaron desde los 2,4 millones del a\u00f1o anterior hasta los 3 millones de toneladas.<\/p>\n<p>Nigeria es el pa\u00eds m\u00e1s poblado de \u00c1frica, con 203,4 millones de habitantes, y las proyecciones indican que llegar\u00e1 a los 392 millones de habitantes para 2050, lo que lo convertir\u00e1 en el cuarto pa\u00eds m\u00e1s poblado del mundo. Un enorme mercado de harina de trigo, que ser\u00e1 abastecido por algunas de las empresas harineras m\u00e1s grandes del mundo.<\/p>\n<p>Durante los \u00faltimos 10 a\u00f1os, Gandaria ha construido terminales graneleras en varios puertos del mundo, equipadas con la \u00faltima tecnolog\u00eda y el sistema de gesti\u00f3n m\u00e1s eficiente.<\/p>\n<p>Algunas de nuestras referencias son:<\/p>\n<ul>\n<li>Baku &#8211; Azerbay\u00e1n: 14.500 toneladas distribuidas en 5 silos mod 16.81\/14.<\/li>\n<li>Constanza &#8211; Ruman\u00eda: 164.000 toneladas distribuidas en 17 silos mod 24.45\/22, con una capacidad de carga de 1200 toneladas por hora.<\/li>\n<li>Tiriyaki &#8211; Turqu\u00eda: 200.000 toneladas, con una capacidad de carga y descarga de 300 toneladas\/hora.<\/li>\n<li>AKT &#8211; Kazajst\u00e1n: 62.000 toneladas distribuidas en 6 silos mod 27.50\/18, con una capacidad de carga y descarga de 500 toneladas\/hora.<\/li>\n<li>Obrinel &#8211; Uruguay: 164.000 toneladas distribuidas en 12 silos mod 27.50\/17, con una capacidad de carga y descarga de 800 toneladas\/hora.<\/li>\n<li>Amberes &#8211; B\u00e9lgica: 20.0000 toneladas distribuidas en 37 silos elevados mod 07.64\/16 45\u00ba, con una capacidad de carga y descarga de 400 toneladas\/hora.<\/li>\n<\/ul>\n<p>En Gandaria nos esforzamos d\u00eda a d\u00eda por ofrecer a nuestros clientes soluciones personalizadas, de alta calidad y precios competitivos, entregando sus pedidos a tiempo y ayud\u00e1ndoles a que sus inversiones sean rentables.<\/p>\n<p>Ing. Nouh Badih &#8211; Area Manager &#8211; Regi\u00f3n MEA<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row column_structure=\u00bb1_2,1_2&#8243; _builder_version=\u00bb3.25&#8243;][et_pb_column type=\u00bb1_2&#8243; _builder_version=\u00bb3.25&#8243; custom_padding=\u00bb|||\u00bb custom_padding__hover=\u00bb|||\u00bb][et_pb_image src=\u00bbhttps:\/\/gandariaspain.com\/wp-content\/uploads\/2019\/03\/Obrinel_Uruguay_.jpg\u00bb url=\u00bbhttps:\/\/gandariaspain.com\/es\/proyectos\/plantas-de-almacenaje\/terminal-granelera-uruguay\/\u00bb align_tablet=\u00bbcenter\u00bb align_phone=\u00bb\u00bb align_last_edited=\u00bbon|desktop\u00bb _builder_version=\u00bb3.23&#8243; animation_style=\u00bbslide\u00bb animation_direction=\u00bbleft\u00bb][\/et_pb_image][et_pb_text _builder_version=\u00bb3.27.4&#8243; animation_direction=\u00bbleft\u00bb link_option_url=\u00bbhttps:\/\/gandariaspain.com\/es\/proyectos\/plantas-de-almacenaje\/terminal-granelera-uruguay\/\u00bb]<\/p>\n<h5>Obrinel \u2013 Uruguay<\/h5>\n<p>164.000 toneladas distribuidas en 12 silos mod 27.50\/17, con una capacidad de carga y descarga de 800 toneladas\/hora.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][et_pb_column type=\u00bb1_2&#8243; _builder_version=\u00bb3.25&#8243; custom_padding=\u00bb|||\u00bb custom_padding__hover=\u00bb|||\u00bb][et_pb_image src=\u00bbhttps:\/\/gandariaspain.com\/wp-content\/uploads\/2019\/03\/Constanza_Roumania.jpg\u00bb url=\u00bbhttps:\/\/gandariaspain.com\/es\/proyectos\/plantas-de-almacenaje\/planta-de-almacenaje-rumania\/\u00bb align_tablet=\u00bbcenter\u00bb align_phone=\u00bb\u00bb align_last_edited=\u00bbon|desktop\u00bb _builder_version=\u00bb3.23&#8243; animation_style=\u00bbslide\u00bb animation_direction=\u00bbleft\u00bb][\/et_pb_image][et_pb_text _builder_version=\u00bb3.27.4&#8243; animation_direction=\u00bbleft\u00bb link_option_url=\u00bbhttps:\/\/gandariaspain.com\/es\/proyectos\/plantas-de-almacenaje\/planta-de-almacenaje-rumania\/\u00bb]<\/p>\n<h5 id=\"firstHeading\" class=\"firstHeading\" lang=\"en\">Constanza \u2013 Ruman\u00eda<\/h5>\n<p>164.000 toneladas distribuidas en 17 silos mod 24.45\/22, con una capacidad de carga de 1200 toneladas por hora.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row column_structure=\u00bb1_2,1_2&#8243; _builder_version=\u00bb3.25&#8243;][et_pb_column type=\u00bb1_2&#8243; _builder_version=\u00bb3.25&#8243; custom_padding=\u00bb|||\u00bb custom_padding__hover=\u00bb|||\u00bb][et_pb_image src=\u00bbhttps:\/\/gandariaspain.com\/wp-content\/uploads\/2018\/08\/silos-terminal-cerealier-belgique-port-Anvers-1.jpg\u00bb url=\u00bbhttps:\/\/gandariaspain.com\/es\/proyectos\/plantas-de-almacenaje\/terminal-granelera-llave-en-mano-en-amberes-belgica\/\u00bb align_tablet=\u00bbcenter\u00bb align_phone=\u00bb\u00bb align_last_edited=\u00bbon|desktop\u00bb _builder_version=\u00bb3.23&#8243; animation_style=\u00bbslide\u00bb animation_direction=\u00bbleft\u00bb][\/et_pb_image][et_pb_text _builder_version=\u00bb3.27.4&#8243; animation_direction=\u00bbleft\u00bb link_option_url=\u00bbhttps:\/\/gandariaspain.com\/es\/proyectos\/plantas-de-almacenaje\/terminal-granelera-llave-en-mano-en-amberes-belgica\/\u00bb]<\/p>\n<h5 id=\"firstHeading\" class=\"firstHeading\" lang=\"en\">Amberes &#8211; B\u00e9lgica<\/h5>\n<p>20.000 toneladas distribuidas en 37 silos mod 07.64\/16 45\u00ba con una capacidad de carga y descarga de 400 toneladas\/hora.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][et_pb_column type=\u00bb1_2&#8243; _builder_version=\u00bb3.25&#8243; custom_padding=\u00bb|||\u00bb custom_padding__hover=\u00bb|||\u00bb][et_pb_image src=\u00bbhttps:\/\/gandariaspain.com\/wp-content\/uploads\/2019\/03\/AKT_Kazajstan.jpg\u00bb url=\u00bbhttps:\/\/gandariaspain.com\/es\/proyectos\/plantas-de-almacenaje\/terminal-granelera-puerto-kazajistan\/\u00bb align_tablet=\u00bbcenter\u00bb align_phone=\u00bb\u00bb align_last_edited=\u00bbon|desktop\u00bb _builder_version=\u00bb3.23&#8243; animation_style=\u00bbslide\u00bb animation_direction=\u00bbleft\u00bb][\/et_pb_image][et_pb_text _builder_version=\u00bb3.27.4&#8243; animation_direction=\u00bbleft\u00bb link_option_url=\u00bbhttps:\/\/gandariaspain.com\/es\/proyectos\/plantas-de-almacenaje\/terminal-granelera-puerto-kazajistan\/\u00bb]<\/p>\n<h5>Aktau \u2013 Kazajist\u00e1n<\/h5>\n<p>62.000 toneladas distribuidas en 6 silos mod 27.50\/18, con una capacidad de carga y descarga de 500 toneladas\/hora.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row column_structure=\u00bb1_2,1_2&#8243; disabled_on=\u00bboff|off|off\u00bb _builder_version=\u00bb3.25&#8243;][et_pb_column type=\u00bb1_2&#8243; _builder_version=\u00bb3.25&#8243; custom_padding=\u00bb|||\u00bb custom_padding__hover=\u00bb|||\u00bb][et_pb_image src=\u00bbhttps:\/\/gandariaspain.com\/wp-content\/uploads\/2019\/03\/Baku-port-Azerbaijan.jpg\u00bb url=\u00bbhttps:\/\/gandariaspain.com\/es\/proyectos\/plantas-de-almacenaje\/planta-de-almacenaje-azerbayan\/\u00bb align_tablet=\u00bbcenter\u00bb align_phone=\u00bb\u00bb align_last_edited=\u00bbon|desktop\u00bb _builder_version=\u00bb3.23&#8243; animation_style=\u00bbslide\u00bb animation_direction=\u00bbleft\u00bb][\/et_pb_image][et_pb_text _builder_version=\u00bb3.27.4&#8243; animation_direction=\u00bbleft\u00bb link_option_url=\u00bbhttps:\/\/gandariaspain.com\/es\/proyectos\/plantas-de-almacenaje\/planta-de-almacenaje-azerbayan\/\u00bb]<\/p>\n<h5 id=\"firstHeading\" class=\"firstHeading\" lang=\"en\">Baku &#8211; Azerbay\u00e1n<\/h5>\n<p>14.500 toneladas distribuidas en 5 silos mod 16.81\/14.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][et_pb_column type=\u00bb1_2&#8243; _builder_version=\u00bb3.25&#8243; custom_padding=\u00bb|||\u00bb custom_padding__hover=\u00bb|||\u00bb][et_pb_image src=\u00bbhttps:\/\/gandariaspain.com\/wp-content\/uploads\/2016\/11\/Grain-silos-Tiryaki_Turkey.jpg\u00bb url=\u00bbhttps:\/\/gandariaspain.com\/es\/proyectos\/plantas-de-almacenaje\/planta-de-almacenaje-turquia\/\u00bb align_tablet=\u00bbcenter\u00bb align_phone=\u00bb\u00bb align_last_edited=\u00bbon|desktop\u00bb _builder_version=\u00bb3.23&#8243; animation_style=\u00bbslide\u00bb animation_direction=\u00bbleft\u00bb][\/et_pb_image][et_pb_text _builder_version=\u00bb3.27.4&#8243; animation_direction=\u00bbleft\u00bb link_option_url=\u00bbhttps:\/\/gandariaspain.com\/es\/proyectos\/plantas-de-almacenaje\/planta-de-almacenaje-turquia\/\u00bb]<\/p>\n<h5>Tiriyaki &#8211; Turqu\u00eda<\/h5>\n<p>200.000 toneladas, con una capacidad de carga y descarga de 300 toneladas\/hora.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row column_structure=\u00bb1_2,1_2&#8243; disabled_on=\u00bboff|off|off\u00bb _builder_version=\u00bb3.25&#8243;][et_pb_column type=\u00bb1_2&#8243; _builder_version=\u00bb3.25&#8243; custom_padding=\u00bb|||\u00bb custom_padding__hover=\u00bb|||\u00bb][\/et_pb_column][et_pb_column type=\u00bb1_2&#8243; _builder_version=\u00bb3.25&#8243; custom_padding=\u00bb|||\u00bb custom_padding__hover=\u00bb|||\u00bb][et_pb_image src=\u00bbhttps:\/\/gandariaspain.com\/wp-content\/uploads\/2019\/03\/NKF_Iran.jpg\u00bb show_in_lightbox=\u00bbon\u00bb align_tablet=\u00bbcenter\u00bb align_phone=\u00bb\u00bb align_last_edited=\u00bbon|desktop\u00bb _builder_version=\u00bb3.23&#8243; animation_style=\u00bbslide\u00bb animation_direction=\u00bbleft\u00bb disabled_on=\u00bbon|on|on\u00bb disabled=\u00bbon\u00bb][\/et_pb_image][et_pb_text _builder_version=\u00bb3.27.4&#8243; animation_direction=\u00bbleft\u00bb disabled_on=\u00bbon|on|on\u00bb disabled=\u00bbon\u00bb]<\/p>\n<h5>NKF \u2013 Ir\u00e1n<\/h5>\n<p>376,000 toneladas distribuidas en 48 silos mod 24.45\/17, con una capacidad de carga de 1.200 toneladas\/hora y una capacidad de descarga de 800 toneladas\/hora.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n<span class=\"et_bloom_bottom_trigger\"><\/span>","protected":false},"excerpt":{"rendered":"<p>La nueva terminal granelera estar\u00e1 situada en el Puerto de [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":48874,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"<p><strong><em>The new bulk terminal will be located in the Port of Tincan, Lagos, Nigeria and will handle over 850,000 tons of wheat and corn per year.<\/em><\/strong><\/p><p>\u00a0<\/p><p>\u00a0<\/p><p>Nigeria\u00a0 \u2014 Lagos - Tincan port-Josepdam Port Services Nigeria Ltd and Silos Cordoba S.L.U just signed a contract for the construction of a new grain storage facility with a total capacity of 145,000 tonnes to store mainly wheat and corn.<\/p><p>\u00a0<\/p><p>Once the facility is completed the firm will be able to handle over 850.000 tons a year.<\/p><p>\u00a0<\/p><p>The storage plant has been conceived <strong>to receive 1.200 tons\/hour<\/strong> \u2013 2 ship unloaders 600 tons\/hour each working on parallel \u2013 and <strong>to deliver up to 600 tons\/hour<\/strong> to the customers on the port and to the local market.<\/p><p>\u00a0<\/p><p>The complete facility will have combination of <strong>flat bottom silos<\/strong> of 10.272,00 and 6.152,00 tons capacity, and will have a <strong>total storage capacity of 145,784 tons.<\/strong><\/p><p>\u00a0<\/p><p>It will also have a truck delivery system with 6 truck loading silos <strong>able to deliver around 20 trucks of 30 tons each per hour<\/strong>.<\/p><p>\u00a0<\/p><p>\u00a0<\/p><p>\u00a0<\/p><p>\u00a0<\/p><p>The facility will <strong>be fully automatized<\/strong>, including <strong>ventilation system, temperature control system<\/strong> and <strong>the latest technology for grain storage management<\/strong>. The construction of the steel silos terminal will cost approximately $80 million and is expected to be completed in two years.<\/p><p>\u00a0<\/p><p>\u00a0<\/p><p>\u00a0<\/p><p>Nigeria imports large quantities of grain to feed its big population. Wheat is important to the diet of many Nigerians, but the country is dependent on imports to produce the wheat flour, pasta and other products consumers require.<\/p><p>\u00a0<\/p><p>The International Grains Council (IGC) puts Nigeria\u2019s total grains production in 2018-19 at 19.1 million tonnes, up from 18.9 million the year before. The figure includes an unchanged 11 million tonnes of corn and 6.5 million of sorghum, up from the previous year\u2019s 6.3-million-tonne crop.<\/p><p>\u00a0<\/p><p>\u00a0<\/p><p>\u00a0<\/p><p>\u00a0<\/p><p>\u00a0<\/p><p>Total imports of grains in Nigeria (which comprises wheat and coarse grains) are forecast at 5.6 million tonnes in 2018-19, up from 5.5 million the year before. Most of the country\u2019s imports are wheat, with imports forecast unchanged at 5.2 million tonnes. Nigeria is also forecast to import 110,000 tonnes of durum wheat, up from 100,000 in 2017-18. The IGC puts Nigeria\u2019s rice crop in 2018 unchanged at 3.8 million tonnes, with rice imports also at 3 million tonnes, up from 2.4 million the previous year.<\/p><p>\u00a0<\/p><p>Nigeria has the largest population (203.4 million) of any African nation. Projections are that it will grow to 392 million by 2050, making it the world\u2019s fourth most populous country.<\/p><p>It is a massive market for wheat flour served by some of the world\u2019s biggest flour milling companies.<\/p><p>\u00a0<\/p><p>\u00a0<\/p><p>Over the last 10 years, Gandaria has built several grain terminal in ports all over the world, which are equipped with the latest technology and the most efficient management system.<\/p><p>\u00a0<\/p><p>Some of our references are:<\/p><p>\u00a0<\/p><ul><li>Azwerbajan: 14.500 tons capacity distributed in 5 silos mod 16.81\/14.<\/li><li>Constanza \u2013 Romania: 164.000 tons distributed in 17 silos mod 24.45\/22, loading capacity 1200 tons\/hour.<\/li><li>Tiriyaki \u2013 Turkey: 200.000 tons, loading and unloading capacity 300 tons\/hour.<\/li><li>AKT \u2013 Kazakhstan: 62.000 tons distributed in 6 silos mod 27.50\/18, loading and unloading capacity 500 tons\/hour.<\/li><li>Obrinel \u2013 Uruguay: 164.000 tons, distributed in 12 silos mod 27.50\/17, loading and unloading 800 tons\/hour.<\/li><li>NKF \u2013 Iran: 376.000 tons, distributed in 48 silos mod 24.45\/17, loading capacity 12000 tons\/hour and unloading capacity 800 tons\/hour.<\/li><\/ul><p>\u00a0<\/p><p>\u00a0<\/p><p>At Gandaria Spain, we strive to provide our clients with customized, high quality and cost-efficient solutions, to meet their demands on time and make their businesses more profitable.\u00a0<\/p><p>\u00a0<\/p><p>\u00a0<\/p><p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Eng. Nouh Badih<\/p><p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/p><p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Area Manager \u2013 MEA Region<\/p>","_et_gb_content_width":"","_mbp_gutenberg_autopost":false,"footnotes":""},"categories":[51],"tags":[],"class_list":["post-48890","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-proyectos-depositos-agua"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Gandaria firma la construcci\u00f3n de una terminal granelera en Nigeria - Gandaria - Silos Spain<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gandaria firma la construcci\u00f3n de una terminal granelera en Nigeria - Gandaria - Silos Spain\" \/>\n<meta property=\"og:description\" content=\"La nueva terminal granelera estar\u00e1 situada en el Puerto de [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/\" \/>\n<meta property=\"og:site_name\" content=\"Gandaria - Silos Spain\" \/>\n<meta property=\"article:published_time\" content=\"2019-03-15T07:50:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-12-27T10:03:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/gandariaspain.com\/wp-content\/uploads\/2019\/03\/Grain-terminals-by-Silos-Cordoba.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"842\" \/>\n\t<meta property=\"og:image:height\" content=\"596\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Silos Spain Gandaria\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Silos Spain Gandaria\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/blog-es\\\/proyectos-depositos-agua\\\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/blog-es\\\/proyectos-depositos-agua\\\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\\\/\"},\"author\":{\"name\":\"Silos Spain Gandaria\",\"@id\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/#\\\/schema\\\/person\\\/d7de0ee9324bc410a6df14842dd5f518\"},\"headline\":\"Gandaria firma la construcci\u00f3n de una terminal granelera en Nigeria\",\"datePublished\":\"2019-03-15T07:50:47+00:00\",\"dateModified\":\"2019-12-27T10:03:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/blog-es\\\/proyectos-depositos-agua\\\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\\\/\"},\"wordCount\":1475,\"image\":{\"@id\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/blog-es\\\/proyectos-depositos-agua\\\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/gandariaspain.com\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/Grain-terminals-by-Silos-Cordoba.jpg\",\"articleSection\":[\"Proyectos dep\u00f3sitos de agua\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/blog-es\\\/proyectos-depositos-agua\\\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\\\/\",\"url\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/blog-es\\\/proyectos-depositos-agua\\\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\\\/\",\"name\":\"Gandaria firma la construcci\u00f3n de una terminal granelera en Nigeria - Gandaria - Silos Spain\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/blog-es\\\/proyectos-depositos-agua\\\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/blog-es\\\/proyectos-depositos-agua\\\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/gandariaspain.com\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/Grain-terminals-by-Silos-Cordoba.jpg\",\"datePublished\":\"2019-03-15T07:50:47+00:00\",\"dateModified\":\"2019-12-27T10:03:40+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/#\\\/schema\\\/person\\\/d7de0ee9324bc410a6df14842dd5f518\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/gandariaspain.com\\\/es\\\/blog-es\\\/proyectos-depositos-agua\\\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/blog-es\\\/proyectos-depositos-agua\\\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\\\/#primaryimage\",\"url\":\"https:\\\/\\\/gandariaspain.com\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/Grain-terminals-by-Silos-Cordoba.jpg\",\"contentUrl\":\"https:\\\/\\\/gandariaspain.com\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/Grain-terminals-by-Silos-Cordoba.jpg\",\"width\":842,\"height\":596},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/\",\"name\":\"Gandaria - Silos Spain\",\"description\":\"Dep\u00f3sitos de agua y silos granja\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/#\\\/schema\\\/person\\\/d7de0ee9324bc410a6df14842dd5f518\",\"name\":\"Silos Spain Gandaria\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/53b3b6d8d6e1be4cd9b580d2e196df5ea53361d2c1d336583ac151d84e053c23?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/53b3b6d8d6e1be4cd9b580d2e196df5ea53361d2c1d336583ac151d84e053c23?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/53b3b6d8d6e1be4cd9b580d2e196df5ea53361d2c1d336583ac151d84e053c23?s=96&d=mm&r=g\",\"caption\":\"Silos Spain Gandaria\"},\"url\":\"https:\\\/\\\/gandariaspain.com\\\/es\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gandaria firma la construcci\u00f3n de una terminal granelera en Nigeria - Gandaria - Silos Spain","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/","og_locale":"es_ES","og_type":"article","og_title":"Gandaria firma la construcci\u00f3n de una terminal granelera en Nigeria - Gandaria - Silos Spain","og_description":"La nueva terminal granelera estar\u00e1 situada en el Puerto de [&hellip;]","og_url":"https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/","og_site_name":"Gandaria - Silos Spain","article_published_time":"2019-03-15T07:50:47+00:00","article_modified_time":"2019-12-27T10:03:40+00:00","og_image":[{"width":842,"height":596,"url":"https:\/\/gandariaspain.com\/wp-content\/uploads\/2019\/03\/Grain-terminals-by-Silos-Cordoba.jpg","type":"image\/jpeg"}],"author":"Silos Spain Gandaria","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Silos Spain Gandaria","Tiempo de lectura":"7 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/#article","isPartOf":{"@id":"https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/"},"author":{"name":"Silos Spain Gandaria","@id":"https:\/\/gandariaspain.com\/es\/#\/schema\/person\/d7de0ee9324bc410a6df14842dd5f518"},"headline":"Gandaria firma la construcci\u00f3n de una terminal granelera en Nigeria","datePublished":"2019-03-15T07:50:47+00:00","dateModified":"2019-12-27T10:03:40+00:00","mainEntityOfPage":{"@id":"https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/"},"wordCount":1475,"image":{"@id":"https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/#primaryimage"},"thumbnailUrl":"https:\/\/gandariaspain.com\/wp-content\/uploads\/2019\/03\/Grain-terminals-by-Silos-Cordoba.jpg","articleSection":["Proyectos dep\u00f3sitos de agua"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/","url":"https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/","name":"Gandaria firma la construcci\u00f3n de una terminal granelera en Nigeria - Gandaria - Silos Spain","isPartOf":{"@id":"https:\/\/gandariaspain.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/#primaryimage"},"image":{"@id":"https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/#primaryimage"},"thumbnailUrl":"https:\/\/gandariaspain.com\/wp-content\/uploads\/2019\/03\/Grain-terminals-by-Silos-Cordoba.jpg","datePublished":"2019-03-15T07:50:47+00:00","dateModified":"2019-12-27T10:03:40+00:00","author":{"@id":"https:\/\/gandariaspain.com\/es\/#\/schema\/person\/d7de0ee9324bc410a6df14842dd5f518"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/gandariaspain.com\/es\/blog-es\/proyectos-depositos-agua\/silos-cordoba-firma-la-construccion-de-una-terminal-granelera-en-nigeria\/#primaryimage","url":"https:\/\/gandariaspain.com\/wp-content\/uploads\/2019\/03\/Grain-terminals-by-Silos-Cordoba.jpg","contentUrl":"https:\/\/gandariaspain.com\/wp-content\/uploads\/2019\/03\/Grain-terminals-by-Silos-Cordoba.jpg","width":842,"height":596},{"@type":"WebSite","@id":"https:\/\/gandariaspain.com\/es\/#website","url":"https:\/\/gandariaspain.com\/es\/","name":"Gandaria - Silos Spain","description":"Dep\u00f3sitos de agua y silos granja","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/gandariaspain.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Person","@id":"https:\/\/gandariaspain.com\/es\/#\/schema\/person\/d7de0ee9324bc410a6df14842dd5f518","name":"Silos Spain Gandaria","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/53b3b6d8d6e1be4cd9b580d2e196df5ea53361d2c1d336583ac151d84e053c23?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/53b3b6d8d6e1be4cd9b580d2e196df5ea53361d2c1d336583ac151d84e053c23?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/53b3b6d8d6e1be4cd9b580d2e196df5ea53361d2c1d336583ac151d84e053c23?s=96&d=mm&r=g","caption":"Silos Spain Gandaria"},"url":"https:\/\/gandariaspain.com\/es\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/gandariaspain.com\/es\/wp-json\/wp\/v2\/posts\/48890","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gandariaspain.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gandariaspain.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gandariaspain.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/gandariaspain.com\/es\/wp-json\/wp\/v2\/comments?post=48890"}],"version-history":[{"count":17,"href":"https:\/\/gandariaspain.com\/es\/wp-json\/wp\/v2\/posts\/48890\/revisions"}],"predecessor-version":[{"id":53147,"href":"https:\/\/gandariaspain.com\/es\/wp-json\/wp\/v2\/posts\/48890\/revisions\/53147"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gandariaspain.com\/es\/wp-json\/wp\/v2\/media\/48874"}],"wp:attachment":[{"href":"https:\/\/gandariaspain.com\/es\/wp-json\/wp\/v2\/media?parent=48890"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gandariaspain.com\/es\/wp-json\/wp\/v2\/categories?post=48890"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gandariaspain.com\/es\/wp-json\/wp\/v2\/tags?post=48890"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}